Engineering Change Order Considerations
Review the following points before you use the Engineering Change Order (ECO) feature:
-
You can use Engineering Change Order only with inventory and assembly items.
-
The feature doesn't support custom workflows for ECO approval. For more information, see SuiteApprovals Considerations.
-
If your NetSuite account has more than 80,000-90,000 active assembly and inventory items per subsidiary, ECO records may fail to load because of the user event script threshold.
-
The feature doesn't support SOAP web services and CSV import.
-
The feature works only with Advanced Bill of Materials (BOM) and it doesn't support Legacy Bill of Materials. For more information, see Enabling Advanced BOM.